Eii NCC vs BIC (British Industrial Competitiveness Scheme)

There is always excitement around a new discount scheme announcement, and you will be hearing about BIC from lots of companies right now.  This guide will give you an overview of what we expect from the scheme compared to the existing Eii with NCC scheme.

The existing Eii Exemption and British Industry Supercharger (Network Charging Compensation) Scheme is designed for the most intensive electricity consumers only, it includes a company level intensity test to prove 20% of GVA is on reference price electricity costs but provides not only exemption from renewable tariffs but also access to network charging compensation rebates.

The British Industrial Competitiveness Scheme is a new scheme targeting Frontier and Foundational manufacturers, it provides similar tariff exemptions to the Eii exemption scheme, also applied to your supply invoices, however you cannot access the NCC scheme network compensations.  In year one, it will provide an additional year of benefit as a one-off compensation payment via your electricity supplier.

Some key facts on the schemes are below:

As you can see, whilst BIC is an amazing opportunity for manufacturers who are not eligible for Eii and NCC, it is of lower value than the original scheme and eligibility for Eii should always be checked too.

MPAN Decoding – The Top Line

In our previous article we gave you some information on what MPANs are and the MPAN Core which you will use mostly when referring to your electricity supplies.  Here, we’re going to give you some more detail on what we can learn about your site from the top row of your MPAN.

The top line has historically been broken into three segments:

  • 00: a two-digit number that identifies the meter’s Profile Class, this was originally used to designate the approximate pattern of usage expected by the meter.
  • 111: the middle segment displays the Meter Time Switch Code (MTC), which tells suppliers whether the supply is single-rate, day/night (Economy 7 or 10), or seasonal time of day.
  • 222: this displays the Line Loss Factor Class (LLFC), which is used by the supplier to help calculate distribution and transmission charges.

MPANs have changed a little recently due to something called the Market-wide Half-Hourly Settlement (MHHS).  It moves all electricity meters to 30-minute settlement intervals.  The MHHS design removed the use of both Profile Classes (except for legacy non-smart meters) and MTCs.  The legacy 3-digit Meter Timeswitch Code (MTC) is replaced by the 4-digit Standard Settlement Configuration (SSC). The other fields keep their position and length; the 3-character LLFC keeps its value but is renamed the DUoS Tariff ID.

Now the top line remains broken into these new three segments, together these give the settlement class of the MPAN for billing to the supplier for the consumer’s usage:

  • 00: a two digit number that typically will read 00 as most metering is now designated HH, however 02 and 04 profile classes have been retained.
  • 1111: Standard Settlement Configuration (SSC). Non-half-hourly supplies are now being designated as HH and switched to smart metering.  NHH supplies however have four-digit codes called the Standard Settlement Configuration, which specifies the number of registers a meter has, and the times that each register is recording electricity usage.  This area of the MPAN will read 0000 for any MPANs where SSC Id is not applicable.
  • 222: DUoS Tariff Id (DUoS), this is a direct replacement of the Line Loss Factor Class, and identifies the DUoS charge category applicable for the MPAN.

So from the MPAN top line, your consultant or supplier can identify what DUoS charges you should be receiving and whether your physical meter was HH coded or time switched non half-hourly.

What is an MPAN?

A Meter Point Administration Number is a code which identifies your supply or export point.  It acts as an address for your electricity flow.  Although the name suggests that an MPAN refers to a particular meter, an MPAN can actually have several meters associated with it, or even no meters in the case of unmetered supplies.

The MPAN system was introduced in 1998 to aid creation of a competitive environment for electricity supply companies, and makes it easier for consumers to switch supplier as well as simplifying administration.  On your invoicing, it typically is presented in a layout similar to the below:

In most cases, you’ll only be working with your MPAN Core and discussing that.  The core is the final 13 digits of the MPAN, the bottom line, and uniquely identifies an exit point. It consists of:

  • a two-digit Distributor ID,
  • an eight-digit unique identifier,
  • then two digits and a single check digit.

The two-digit Distributor ID is a code which tells us which DNO or IDNO your MPAN is supplied by.  District Network Operators initially formed out of regional electricity companies’ distribution arms.  There are fourteen of these with distinct operational regions as shown on the map below.  Independent Distribution Network Operators, these operate in the same market as DNOs but are not regionally-bound in their operation.  DNOs or IDNOs are responsible for allocating MPANs to supply point locations, they create your MPAN for you.

Distribution network operator – Wikipedia

The final digit in the MPAN is the check digit, and validates the previous 12 to ensure that the MPAN is valid using a modulus 11 test. The check digit is calculated thus:

  1. Multiply the first digit by 3
  2. Multiply the second digit by the next prime number (5)
  3. Repeat this for each digit (missing 11 out on the list of prime numbers for the purposes of this algorithm)
  4. Add up all these products
  5. The check digit is modulo 11, modulo 10.

In our next article we will go into detail on what we can learn from the top row of your MPAN.

ESOS – Escaping the Cycle

ESOS has always had alternative routes to compliance, in Phase 4 we see two of these being removed, but the third strengthened.  DECs and GDAs are no longer an option for deemed compliance, but ISO 50001 is.

ISO 50001 certification can be used as an alternative route to ESOS compliance, removing the need to appoint a lead assessor if:

  1. The ISO 50001 certification covers either the total or significant energy consumption.
  2. The ISO certificate was issued on or after the start date of the compliance period (6th December 2023) and must remain valid on the compliance date (5th December 2027).

Your energy management system must be certified by one of the following:

  • a UKAS accredited certification body
  • a body accredited by an EU member state’s national accreditation body
  • a body accredited by a member of the International Accreditation Forum

If only part of your significant energy consumption is covered by your certificate then you must appoint a lead assessor and undertake energy audits to appropriately capture your SEC.

If you do comply via ISO 50001 you still have to:

  • calculate your total energy consumption and, as applicable, significant energy consumption
  • calculate energy intensity ratios
  • get a director (or equivalent) to confirm that the information required for the notification of compliance is correct
  • submit a notification of compliance through MESOS
  • keep an evidence pack

There are many benefits to ISO accreditation and the pursuit of a compliant energy management system, reducing the cost of ESOS compliance is only a small part of the picture.  If you feel your organisation might be ready then it may be too late to use it for compliance for ESOS Phase 4 but getting a gap analysis is a great first step and will bring savings for Phase 5.

ESOS Phase 4 – who’s captured and what’s changed?

It feels like yesterday the ESOS 3 Action Plans were being drafted, but here we are again preparing for the next cycle of the Energy Savings Opportunities Scheme.  So what’s new in the fourth iteration of the scheme?  Not as much as we were expecting in the end!

During consultation we were expecting this phase to operate quite differently to ESOS P3.  The government consulted on:

  • improving the quality of audits through increased standardisation of reporting requirements
  • the inclusion of a net zero element to audits
  • requiring public disclosure of high-level recommendations by participants

Most of the items were approved, with varying timelines, some to be implemented immediately for Phase 3, others to delay until Phase 4.

https://www.gov.uk/government/consultations/strengthening-the-energy-savings-opportunity-scheme-esos

Since then, we have had government changes and the outcome of the consultation has not been applied as expected.  Changes from ESOS P3 that are planned to go ahead are:

  • removal of Display Energy Certificates (DECs) and Green Deal Assessments (GDAs) as compliance routes
  • progress against action plan commitments to be included in the ESOS assessment
  • where action plan commitments have not been met, participants must provide an explanation

Due to delays in legislature the items which were previously planned to align ESOS with Net Zero and SECR have been pushed to Phase 5.  These would have been:

  • changes to refocus the scheme to cover net zero as well as energy efficiency
  • change to qualification thresholds to better align with Streamlined Energy and Carbon Reporting (SECR)

Here at Ethical Sustainability we will be operating to the newer PAS 51215-1:2025, and PAS 51215-2:2025 standards voluntarily.  Our priority remains tailoring our surveying and your recommendations to align with your business strategy and manufacturing priorities.

Jargon Buster

This article will always be pinned on our articles page, we would encourage you to bookmark it!  Our industry is full of acronyms, and our founder detests them.  So here, you can find an explanation of every acronym we use day-to-day.  We add to this whenever we realise there’s another that we haven’t got listed so it’s a long document but we hope you find it useful!

Utility Procurement

DA: Data Aggregator, after the data collector has validated it, the data is submitted to a data aggregator who profiles it into settlements, resolves any exceptions and submits it to be used to bill the supplier for the energy that consumers have used.

DC: Data Collector, responsible for remotely collecting 48 half-hourly periods of consumption data from each meter, or manually reading where remote connection is not possible.  The data collector then validates the data and if they have been unable to obtain actual data creates estimates in line with industry regulations.  They then securely submit the data to your registered supplier for billing.  The Balancing and Settlement Code mandates 99% actual data for HH meters so any meter issues should be rectified promptly.

KWh, A Kilowatt Hour.  This is a unit of power over time, the output of a kilo-watt over an hour period, which roughly equates to 3.6 megajoules.  It is the standard unit used in billing for electricity.

MOP: Meter Operator, appointed either directly or via your supplier for each meter.  MOP contracts typically run for long durations, at least 5 years and the meter operator is  responsible for installing, operating, maintaining, and managing electricity meters.  They look after the physical asset.

MPAN, Meter Point Administration Number.  A 22 digit reference number used to identify an electricity supply point.  It is comprised of 9 digits which detail information about the supply point and a 13 digit unique identifier or ‘core’.  See our dedicated article on decoding your MPAN here

MPRN, Meter Point Reference Number.  The equivalent of an MPAN for a gas distribution point.

MWh, A Megawatt Hour, 1,000 kwh or 3.6 billion joules.  Large consumers may find that professionals in the industry speak in MWh about their volume for ease.  It is unlikely that you will see other metric abbreviations but we have included them here for your reference:

Value Symbol

Name

10−6 μW⋅h microwatt-hour
10−3 mW⋅h milliwatt-hour
100 W⋅h watt-hour
103 kW⋅h kilowatt-hour
106 MW⋅h megawatt-hour
109 GW⋅h gigawatt-hour
1012 TW⋅h terawatt-hour
1015 PW⋅h petawatt-hour

DNO, District Network Operators.  These initially formed out of regional electricity companies’ distribution arms.  There are fourteen of these with distinct operational regions as shown on the map below, and the relevant portion of the MPAN can identify the region where the meter is based for those DNO references.  DNOs are responsible for allocating MPANs to supply point locations.

Distribution network operator – Wikipedia

IDNO: Independent Distribution Network Operators, these operate in the same market as DNOs but are not regionally-bound in their operation.  Often these are found in areas of more recent additions to the network such as for housing estates.  These are also all allocated codes for inclusion in the MPAN however they do not identify the physical location of the supply point.

SSC: Standard Settlement Configuration (SSC).  Non half-hourly supplies have four-digit codes called the standard settlement configuration, which specifies the number of registers a meter has, and the times that each register is recording electricity usage, indicating the switching time.  This has now been added to the MPAN to capture the data as more meters are designated as HH profiles and smart meters are rolled out.

TPI: Third Party Intermediary.  Any company that works between a supplier and their customer, whether they call themselves a TPI, Consultancy or an arms-length government agency, if involved in helping to procure commercial energy contracts the company is a TPI.  TPIs are unregulated, though there are live proposals to change this.

Non-Commodities

BIC: The British Industrial Competitiveness Scheme.  A brand new scheme for 2027 financial year, with a back payment covering the discounts that would have been secured were the scheme active in 2026.  It exempts eligible manufacturers from the costs of Renewables Obligation (RO), Feed-in Tariffs (FIT) and the Capacity Market (CM). based on SIC code alone.

CCA: Climate Change Agreements.  These have existed since 2001 and were one of the first schemes to help manufacturers by limiting the costs of utility taxes and levies.  Companies agree to reduce energy use and carbon dioxide emissions in exchange for a reduction in CCL taxes on consumed energy.

CHPQA: The Combined Heat and Power Quality Assurance (CHPQA) Programme is designed to give exemption from the main rates of CCL tax and fuel-oil duty amongst other taxes and business rates for those operating their CHPs in an efficient way.

CPS: The Carbon Price Support Mechanism tax on fuels used in electricity generation was introduced in 2013 provide additional support to the emissions trading scheme.  The government has announced that CPS will be removed from April 2028

Eii: Energy Intensive Industries.  The Eii Exemption scheme provides relief of up to 100% of Renewables Obligation (RO), Feed-in Tariffs (FiT), Contracts for Difference (CfD) and Capacity Market (CM) charges for manufacturers who meet a 20% electrical intensity threshold.  Initially, the discount was set at 85% of these charges but as of 2024 eligible businesses are now exempt from 100% of these charges.  There is also an Eii Compensation scheme and a NI equivalent scheme which serve similar purposes but with different implementation mechanisms.

NCC: The Network Charging Compensation Scheme (NCC) also known as the Supercharger was added to the Eii scheme to provide additional relief from the charges of maintaining the network for eligible Eii businesses.  It provides relief of up to 90% of the costs of Transmission Network Use of System (TNUoS), Distribution Use of System (DUoS), Balancing Services Use of System (BSUoS) and related losses.

UKETS:  The UK Emissions Trading Scheme.  This is a successor to the EU ETS created for the UK following Brexit.  The UK ETS applies to regulated activities which result in greenhouse gas emissions, including combustion of fuels on a site where combustion units with a total rated thermal input exceeding 20MW are operated, it is mandatory.  A cap is set on the total amount of certain greenhouse gases that can be emitted by sectors covered by the scheme. Each year, operators covered by the scheme must surrender allowances to cover their emissions. The cap is reduced over time, so that total emissions must fall.  Participants receive free allowances and/or buy allowances at auction or on the secondary market

UKETS CPS Compensation Scheme: A scheme designed to compensate electricity intensive industries deemed to be exposed to a significant risk of carbon leakage due to the indirect costs of the UK ETS and the CPS mechanism.  A very limited set of companies are eligible, with only14 SIC codes covered and a threshold that indirect carbon costs amount to 5% or more of their gross value added (GVA).

Energy Efficiency

DEC: Display Energy Certificates are a mandatory for buildings occupied by a public authority where, from 9 July 2015, the total useful floor area of the building exceeds 250m2 and which is frequently visited by the public.  They rate the energy efficiency of the building from A to G based on the amount of metered energy used by the building over the last 12 months.

EPC: Energy Performance Certificates are intended to provide prospective buyers and tenants of a building with information about the energy performance of the building and practical advice on improving its performance.  It is based on the building fabric and services and is required when a building is being sold or rented and remains valid for ten years.

ESOS: Energy Savings Opportunities Scheme.  This is mandatory for large undertakings in the UK to assess the energy efficiency of their properties and identify potential improvements on a four yearly cycle.

ESOS APPR: Energy Savings Opportunities Scheme Action Plans and Progress Reports, since Phase 3 any business captured by ESOS is also required to provide an action plan following their submission, and progress reports to show what actions they have taken to improve energy efficiency.

MEES: Minimum Energy Efficiency Requirements apply to domestically rented buildings.  Landlords are required to improve properties to at least an E EPC rating unless they have a valid exemption in place.  The requirement is to spend up to £3,500 on improvements.

SEC: Significant Energy Consumption, identified assets and activities that comprise 95% of your Total Energy Consumption.

TEC: Total Energy Consumption, for ESOS you must calculate your total energy consumption over a reference period of 12 consecutive months.  This includes any energy that is both supplied to and consumed by your organisation.  Typically calculated in kWh.

TM44: TM44 is a mandatory five yearly inspection for any air conditioning system that uses a refrigerant as a cooling agent, and has an effective rated output of more than 12kW.  It outputs a comprehensive report on the efficiency of the air conditioning system and guidance on how this can be improved and is often a valuable tool in improving energy efficiency.

Carbon

SECR: Streamlined Energy & Carbon Reporting is a mandatory public disclosure of carbon emissions in place since 2019 for companies that meet two of these criteria – 250 employees, £36 Million Turnover, £18 Million Balance Sheet.

TCFD: Task Force on Climate-related Financial Disclosure (TCFD) -aligned disclosure, the UK government’s application of the TCFD recommendations.  An annual climate-related financial disclosure that must be made by certain public sector bodies and large companies.  It follows a prescriptive format and should provide information for investors on how the viability of that business may be impacted by a changing climate.  It is expected that the UK SRS will make TCFD reporting obsolete.

UK SRS: The UK Sustainability Reporting Standards are a new regulatory framework for carbon and climate disclosures which are expected to become mandatory for captured organisations in 2027.  They are based on the IFRS standards created by their International Sustainability Standards Board and align with EU disclosure plans.